Goodnight Wind II (23INR0637)

Goodnight Wind II is a 259.2 MW other interconnection project in Armstrong, Texas with a current status of operational. It is proposed to connect at tap 345kV 23900 Alibates - 23914 Tule Canyon CKT2.

259.2 MWCapacity
OperationalStatus
ArmstrongMarket
OtherTechnology

Project facts

Canonical nameGoodnight Wind II
Queue ID23INR0637
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketArmstrong
TechnologyOther
Capacity259.2 MW
StateTexas
CountyArmstrong
Point of interconnectiontap 345kV 23900 Alibates - 23914 Tule Canyon CKT2
Requested (queue) date2023-04-19
Proposed in-service date
Operational date2027-06-06
Withdrawn date
DeveloperFGE Goodnight II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.