Gopher Creek Wind (18INR0067)

Gopher Creek Wind is a 158.0 MW wind interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 11306 Dermott 138kV.

158.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameGopher Creek Wind
Queue ID18INR0067
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity158.0 MW
StateTexas
CountyBorden
Point of interconnection11306 Dermott 138kV
Requested (queue) date2017-07-10
Proposed in-service date2020-01-31
Operational date2019-05-30
Withdrawn date
DeveloperTerna Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.