Grand Prairie 345 kV (GEN-2016-165)

Grand Prairie 345 kV is a 202.0 MW wind interconnection project in Knox, Nebraska with a current status of withdrawn. It is proposed to connect at Grand Prairie 345 kV.

202.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameGrand Prairie 345 kV
Queue IDGEN-2016-165
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity202.0 MW
StateNebraska
CountyKnox
Point of interconnectionGrand Prairie 345 kV
Requested (queue) date2016-11-30
Proposed in-service date
Operational date
Withdrawn date2019-09-05
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata