Granite Falls 115kV substation (GEN-2016-036)

Granite Falls 115kV substation is a 44.6 MW wind interconnection project in Chippewa County, Minnesota with a current status of operational. It is proposed to connect at Granite Falls 115kV substation.

44.6 MWCapacity
OperationalStatus
MNMarket
WindTechnology

Project facts

Canonical nameGranite Falls 115kV substation
Queue IDGEN-2016-036
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketMN
TechnologyWind
Capacity44.6 MW
StateMinnesota
CountyChippewa County
Point of interconnectionGranite Falls 115kV substation
Requested (queue) date2016-03-28
Proposed in-service date
Operational date2018-11-17
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata