Grass River Solar (C24-156)

Grass River Solar is a 80.0 MW solar interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at N. Ogdensburg - Alcoa 115 kV Line (Line # 13).

80.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameGrass River Solar
Queue IDC24-156
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity80.0 MW
StateNew York
CountySt. Lawrence
Point of interconnectionN. Ogdensburg - Alcoa 115 kV Line (Line # 13)
Requested (queue) date2024-09-12
Proposed in-service date
Operational date
Withdrawn date
DeveloperGranada Solar, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata