GRE-NININGR7 115 kV (J3172)

GRE-NININGR7 115 kV is a 100.0 MW battery interconnection project in Dakota, Minnesota with a current status of operational. It is proposed to connect at GRE-NININGR7 115 kV.

100.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameGRE-NININGR7 115 kV
Queue IDJ3172
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity100.0 MW
StateMinnesota
CountyDakota
Point of interconnectionGRE-NININGR7 115 kV
Requested (queue) date2022-09-14
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata