Green Acres 138 kV Substation (43684) (S1044)

Green Acres 138 kV Substation (43684) is a 50.0 MW generation interconnection project in Lake, Indiana with a current status of operational. It is proposed to connect at Green Acres 138 kV Substation (43684).

50.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameGreen Acres 138 kV Substation (43684)
Queue IDS1044
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity50.0 MW
StateIndiana
CountyLake
Point of interconnectionGreen Acres 138 kV Substation (43684)
Requested (queue) date2023-04-17
Proposed in-service date2024-04-07
Operational date2024-04-07
Withdrawn date
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata