Green Acres138kV Subtation (J1353)

Green Acres138kV Subtation is a 150.0 MW battery interconnection project in Lake County, Indiana with a current status of withdrawn. It is proposed to connect at Green Acres138kV Subtation.

150.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameGreen Acres138kV Subtation
Queue IDJ1353
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity150.0 MW
StateIndiana
CountyLake County
Point of interconnectionGreen Acres138kV Subtation
Requested (queue) date2019-04-29
Proposed in-service date2023-05-30
Operational date2023-05-30
Withdrawn date2023-09-05
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata