Green River Solar (68297_4598)

Green River Solar is a 200.0 MW solar interconnection project in Meade, Kentucky with a current status of operational.

200.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameGreen River Solar
Queue ID68297_4598
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity200.0 MW
StateKentucky
CountyMeade
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-05-01
Withdrawn date—
Developer—
Utility / transmission ownerGreen River Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.