Greenalia Solar Power Misae III (68769_M3GSP)

Greenalia Solar Power Misae III is a 169.6 MW solar interconnection project in Childress, Texas with a current status of active.

169.6 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameGreenalia Solar Power Misae III
Queue ID68769_M3GSP
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketERCO
TechnologySolar
Capacity169.6 MW
StateTexas
CountyChildress
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGreenlia Solar Power Misae III, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2027-05-012027-09-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata