Childress County, Texas — Interconnection Projects

The interXdata warehouse tracks 13 interconnection projects in Childress, Texas, representing 2,082 MW of requested capacity.

13Total projects
1Active
8Operational
3Withdrawn
2,082 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar111,982 MW
Other2100 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Fagus Solar Park67123_MISIISolar331.6 MWoperationalChildress, Texas
Misae Solar18INR0045Solar240.8 MWoperationalChildress, Texas
Misae Solar62249_77777Solar240.0 MWoperationalChildress, Texas
Shorthorn 2 Solar20INR0005Solar200.0 MWwithdrawnChildress, Texas
Greenalia Solar Power Misae III68769_M3GSPSolar169.6 MWactiveChildress, Texas
Fagus Solar Park 3 SLF26INR0524Solar169.6 MWoperationalChildress, Texas
Fagus Solar Park 2 SLF25INR0672Solar166.6 MWoperationalChildress, Texas
Fagus Solar Park 1 SLF20INR0091Solar166.4 MWoperationalChildress, Texas
Ponil Solar24INR0004Solar145.0 MWwithdrawnChildress, Texas
Independence Trail Storage21INR0455Other100.0 MWoperationalChildress, Texas
Proteus Oak Forest Solar25INR0461Solar100.0 MWwithdrawnChildress, Texas
Mars Solar20INR0232Solar52.8 MWsuspendedChildress, Texas
Fagus Storage SLF25INR0515Other0.0 MWoperationalChildress, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Childress County.

Start tracking with interXdata