Greenway 138 kV (S1167)
Greenway 138 kV is a 99.0 MW generation interconnection project in Coles, Illinois with a current status of operational. It is proposed to connect at Greenway 138 kV.
99.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | Greenway 138 kV |
|---|---|
| Queue ID | S1167 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Generation |
| Capacity | 99.0 MW |
| State | Illinois |
| County | Coles |
| Point of interconnection | Greenway 138 kV |
| Requested (queue) date | 2026-07-02 |
| Proposed in-service date | 2030-06-01 |
| Operational date | 2030-06-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMEREN ILLINOIS |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-19 | capacity_mw | 0.0 | 99 | high |
| 2026-08-15 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata