The interXdata warehouse tracks 15 interconnection projects in Coles, Illinois, representing 3,277 MW of requested capacity.
15Total projects
1Active
8Operational
6Withdrawn
3,277 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 4 | 1,100 MW |
| Solar | 6 | 912 MW |
| Coal | 1 | 726 MW |
| Battery | 3 | 440 MW |
| Other | 1 | 99 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project G661 — Coal in Coles, Illinois | G661 | Coal | 726.0 MW | withdrawn | Coles, Illinois |
| Coles Wind | 68184_COLES | Wind | 300.0 MW | active | Coles, Illinois |
| 7ARLAND - 7FARADAY 345.0kV | J2128 | Wind | 300.0 MW | operational | Coles, Illinois |
| Mattoon East 138 kV | J2504 | Battery | 300.0 MW | withdrawn | Coles, Illinois |
| Kansas - Faraday 345 kV | J1757 | Wind | 300.0 MW | withdrawn | Coles, Illinois |
| Mattoon East | J3012 | Solar | 287.0 MW | operational | Coles, Illinois |
| 7CASEY - 7KANSAS 345.0kV | J3391 | Wind | 200.3 MW | operational | Coles, Illinois |
| Prairie Wolf Solar LLC | 62893_PWOLF | Solar | 200.0 MW | operational | Coles, Illinois |
| Kansas West Substation 138kV | J2393 | Solar | 164.0 MW | withdrawn | Coles, Illinois |
| Mattoon West | J1974 | Solar | 160.0 MW | withdrawn | Coles, Illinois |
| Mattoon West | J3968 | Battery | 100.0 MW | operational | Coles, Illinois |
| Cooks Mill PV I | 67991_CKML | Solar | 99.0 MW | operational | Coles, Illinois |
| Greenway 138 kV | S1167 | — | 99.0 MW | operational | Coles, Illinois |
| Mattoon West | J1975 | Battery | 40.0 MW | withdrawn | Coles, Illinois |
| Triple S Solar I LLC CSG | 67717_TRIP1 | Solar | 2.0 MW | operational | Coles, Illinois |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Coles County.
Start tracking with interXdata