Greenwood Energy Storage 2 is a 513.2 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at RANCHO VISTA 230 kV.

513.2 MWCapacity
WithdrawnStatus
CAISOMarket
BatteryTechnology

Project facts

Canonical nameGreenwood Energy Storage 2
Queue ID54719
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyBattery
Capacity513.2 MW
StateCalifornia
County
Point of interconnectionRANCHO VISTA 230 kV
Requested (queue) date2023-04-17
Proposed in-service date2031-03-31
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerSCE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata