GREENWOOD ENERGY STORAGE (2121)

GREENWOOD ENERGY STORAGE is a 250.0 MW battery interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Mesa Substation 500 kV.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameGREENWOOD ENERGY STORAGE
Queue ID2121
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity250.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionMesa Substation 500 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date2026-08-12
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-14withdrawn_date2026-08-12high
2026-08-14statusactivewithdrawnhigh
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata