Gregory BESS is a 9.9 MW other interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at Station Name: Gregory_x000D_ TSP Station Code: GREGORY_x000D_ Load Transformer name: LOAD2_x000D_ Bus#: 8421_x000D_ Voltage in kV (Transmission Level): 69kV_x000D_ .
Project facts
| Canonical name | Gregory BESS |
|---|---|
| Queue ID | 23INR0539 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Other |
| Capacity | 9.9 MW |
| State | Texas |
| County | San Patricio |
| Point of interconnection | Station Name: Gregory_x000D_ TSP Station Code: GREGORY_x000D_ Load Transformer name: LOAD2_x000D_ Bus#: 8421_x000D_ Voltage in kV (Transmission Level): 69kV_x000D_ |
| Requested (queue) date | 2023-07-12 |
| Proposed in-service date | 2024-11-11 |
| Operational date | 2024-11-07 |
| Withdrawn date | — |
| Developer | Regis Gregory LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata