Gregory BESS (23INR0539)

Gregory BESS is a 9.9 MW other interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at Station Name: Gregory_x000D_ TSP Station Code: GREGORY_x000D_ Load Transformer name: LOAD2_x000D_ Bus#: 8421_x000D_ Voltage in kV (Transmission Level): 69kV_x000D_ .

9.9 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameGregory BESS
Queue ID23INR0539
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity9.9 MW
StateTexas
CountySan Patricio
Point of interconnectionStation Name: Gregory_x000D_ TSP Station Code: GREGORY_x000D_ Load Transformer name: LOAD2_x000D_ Bus#: 8421_x000D_ Voltage in kV (Transmission Level): 69kV_x000D_
Requested (queue) date2023-07-12
Proposed in-service date2024-11-11
Operational date2024-11-07
Withdrawn date
DeveloperRegis Gregory LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata