Gretna-Mt. Airy 69kV (AH1-130)

Gretna-Mt. Airy 69kV is a 20.0 MW battery interconnection project in Pittsylvania, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameGretna-Mt. Airy 69kV
Queue IDAH1-130
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity20.0 MW
StateVirginia
CountyPittsylvania
Point of interconnection—
Requested (queue) date2021-08-24
Proposed in-service date2023-02-28
Operational date—
Withdrawn date2024-12-18
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata