Greyhound Solar - Phase F (26INR0670)

Greyhound Solar - Phase F is a 101.6 MW solar interconnection project in Ector, Texas with a current status of active. It is proposed to connect at Tap 345kV 11010 Wolf - 1018 Moss.

101.6 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGreyhound Solar - Phase F
Queue ID26INR0670
Statusactive
Source statusactive
MarketERCOT
TechnologySolar
Capacity101.6 MW
StateTexas
CountyEctor
Point of interconnectionTap 345kV 11010 Wolf - 1018 Moss
Requested (queue) date2025-04-17
Proposed in-service date2025-11-13
Operational date
Withdrawn date
DeveloperRockhound Solar 2, LLC dba "Greyhound Solar"
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata