Grimes County Solar (23INR0160)

Grimes County Solar is a 211.2 MW solar interconnection project in Grimes, Texas with a current status of active. It is proposed to connect at 2 Keith Switch 138kV.

211.2 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGrimes County Solar
Queue ID23INR0160
Statusactive
Source statusactive
MarketERCOT
TechnologySolar
Capacity211.2 MW
StateTexas
CountyGrimes
Point of interconnection2 Keith Switch 138kV
Requested (queue) date2021-01-26
Proposed in-service date2025-11-30
Operational date
Withdrawn date
DeveloperGrimes County Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata