Grimes County Solar (23INR0160)
Grimes County Solar is a 211.2 MW solar interconnection project in Grimes, Texas with a current status of active. It is proposed to connect at 2 Keith Switch 138kV.
211.2 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | Grimes County Solar |
|---|---|
| Queue ID | 23INR0160 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 211.2 MW |
| State | Texas |
| County | Grimes |
| Point of interconnection | 2 Keith Switch 138kV |
| Requested (queue) date | 2021-01-26 |
| Proposed in-service date | 2025-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Grimes County Solar Project, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.