Grit DP-Perth 115 kV (AG1-539 - moved to TC1)

Grit DP-Perth 115 kV is a 75.0 MW battery interconnection project in Pittsylvania, Virginia with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameGrit DP-Perth 115 kV
Queue IDAG1-539 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity75.0 MW
StateVirginia
CountyPittsylvania
Point of interconnection—
Requested (queue) date2020-09-30
Proposed in-service date2024-10-01
Operational date—
Withdrawn date2024-06-24
Developer—
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata