Grizzly Ridge Solar (21INR0375)

Grizzly Ridge Solar is a 101.7 MW solar+battery interconnection project in Hamilton, Texas with a current status of operational. It is proposed to connect at 69kV 178 Pottsville.

101.7 MWCapacity
OperationalStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameGrizzly Ridge Solar
Queue ID21INR0375
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar+Battery
Capacity101.7 MW
StateTexas
CountyHamilton
Point of interconnection69kV 178 Pottsville
Requested (queue) date2019-07-07
Proposed in-service date2023-10-27
Operational date2023-10-20
Withdrawn date
DeveloperGrizzly Ridge Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata