Groton Flanders Road Landfill (70437_GROTN)

Groton Flanders Road Landfill is a 5.0 MW solar interconnection project in New London, Connecticut with a current status of active.

5.0 MWCapacity
ActiveStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameGroton Flanders Road Landfill
Queue ID70437_GROTN
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketISNE
TechnologySolar
Capacity5.0 MW
StateConnecticut
CountyNew London
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNJR Clean Energy Ventures Corporation

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata