Grottoes-Merck 115kV (AE2-029)

Grottoes-Merck 115kV is a 50.0 MW solar interconnection project in Rockingham, Virginia with a current status of operational.

50.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameGrottoes-Merck 115kV
Queue IDAE2-029
Statusoperational
Source statusPartially in Service - Under Construction
Market—
TechnologySolar
Capacity50.0 MW
StateVirginia
CountyRockingham
Point of interconnection—
Requested (queue) date2018-12-29
Proposed in-service date—
Operational date2026-11-01
Withdrawn date—
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-11operational_date—2026-11-01medium
2026-09-11statusactiveoperationalhigh
2026-09-11proposed_online_date2026-11-01—medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata