Gulf Wind 2 (20INR0043)

Gulf Wind 2 is a 226.5 MW wind interconnection project in Kenedy, Texas with a current status of suspended.

226.5 MWCapacity
SuspendedStatus
KenedyMarket
WindTechnology

Project facts

Canonical nameGulf Wind 2
Queue ID20INR0043
Statussuspended
Source status
MarketKenedy
TechnologyWind
Capacity226.5 MW
StateTexas
CountyKenedy
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.