Gusty Hill Wind (20INR0116)

Gusty Hill Wind is a 350.0 MW wind interconnection project in Culberson, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 7387 Kunitz - 71097 Culberson.

350.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameGusty Hill Wind
Queue ID20INR0116
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity350.0 MW
StateTexas
CountyCulberson
Point of interconnectiontap 138kV 7387 Kunitz - 71097 Culberson
Requested (queue) date2018-06-28
Proposed in-service date2022-12-01
Operational date
Withdrawn date2019-11-18
DeveloperGusty Hill Wind Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.