GV SOLAR 3 (947)

GV SOLAR 3 is a 120.0 MW solar interconnection project in Tulare, California with a current status of withdrawn. It is proposed to connect at Olive Substation 115 kV.

120.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGV SOLAR 3
Queue ID947
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologySolar
Capacity120.0 MW
StateCalifornia
CountyTulare
Point of interconnectionOlive Substation 115 kV
Requested (queue) date2013-04-30
Proposed in-service date—
Operational date—
Withdrawn date2014-03-06
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.