GWENT STORAGE 2 (2090)

GWENT STORAGE 2 is a 465.0 MW battery interconnection project in Ventura, California with a current status of withdrawn. It is proposed to connect at Moorpark Substation 230 kV.

465.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameGWENT STORAGE 2
Queue ID2090
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyBattery
Capacity465.0 MW
StateCalifornia
CountyVentura
Point of interconnectionMoorpark Substation 230 kV
Requested (queue) date2021-04-15
Proposed in-service date—
Operational date—
Withdrawn date2025-10-28
Developer—
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.