Hackberry Draw Solar (30INR0146)

Hackberry Draw Solar is a 653.0 MW solar interconnection project in Jones, Texas with a current status of active. It is proposed to connect at Tap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2 .

653.0 MWCapacity
ActiveStatus
JonesMarket
SolarTechnology

Project facts

Canonical nameHackberry Draw Solar
Queue ID30INR0146
Statusactive
Source statusSS Started, FIS Started, No IA
MarketJones
TechnologySolar
Capacity653.0 MW
StateTexas
CountyJones
Point of interconnectionTap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2
Requested (queue) date2026-08-03
Proposed in-service date2030-04-30
Operational date—
Withdrawn date—
DeveloperOrsted Onshore Development North America, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.