Hamby Solar (26INR0440)

Hamby Solar is a 205.8 MW solar interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at 6245 ABILENE ROBERTSON PRISON 138 KV .

205.8 MWCapacity
OperationalStatus
JonesMarket
SolarTechnology

Project facts

Canonical nameHamby Solar
Queue ID26INR0440
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketJones
TechnologySolar
Capacity205.8 MW
StateTexas
CountyJones
Point of interconnection 6245 ABILENE ROBERTSON PRISON 138 KV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2028-06-27
Withdrawn date
DeveloperAbilene GCE LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata