Hampton BESS 3 (AG2-010)

Hampton BESS 3 is a 100.0 MW battery interconnection project in City Of Hampton, Virginia with a current status of withdrawn. It is proposed to connect at Peninsula-Whealton 115 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameHampton BESS 3
Queue IDAG2-010
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity100.0 MW
StateVirginia
CountyCity Of Hampton
Point of interconnectionPeninsula-Whealton 115 kV
Requested (queue) date2025-02-24
Proposed in-service date2023-01-01
Operational date
Withdrawn date2025-11-19
DeveloperDelorean Power LLC dba Lightshift Energy
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.