Hanford 1 and 2 (59300_HAN2)

Hanford 1 and 2 is a 1.5 MW solar interconnection project in Kings, California with a current status of operational.

1.5 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameHanford 1 and 2
Queue ID59300_HAN2
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity1.5 MW
StateCalifornia
CountyKings
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2014-08-01
Withdrawn date—
Developer—
Utility / transmission ownerArevon Energy, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata