Harmony Village 230 kV (AG1-057)
Harmony Village 230 kV is a 20.0 MW battery interconnection project in Middlesex, Virginia with a current status of withdrawn.
20.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Harmony Village 230 kV |
|---|---|
| Queue ID | AG1-057 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | Virginia |
| County | Middlesex |
| Point of interconnection | — |
| Requested (queue) date | 2020-07-27 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | 2023-09-12 |
| Developer | — |
| Utility / transmission owner | Dominion |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.