Harrison Township 12kV (W4-040)

Harrison Township 12kV is a 9.7 MW solar interconnection project in Gloucester, New Jersey with a current status of withdrawn.

9.7 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHarrison Township 12kV
Queue IDW4-040
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity9.7 MW
StateNew Jersey
CountyGloucester
Point of interconnection
Requested (queue) date2010-12-30
Proposed in-service date2012-05-13
Operational date
Withdrawn date2014-06-02
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.