Harrowgate-Locks 115kV (AE2-027)
Harrowgate-Locks 115kV is a 120.0 MW solar interconnection project in Chesterfield, Virginia with a current status of suspended.
120.0 MWCapacity
SuspendedStatus
—Market
SolarTechnology
Project facts
| Canonical name | Harrowgate-Locks 115kV |
|---|---|
| Queue ID | AE2-027 |
| Status | suspended |
| Source status | Suspended |
| Market | — |
| Technology | Solar |
| Capacity | 120.0 MW |
| State | Virginia |
| County | Chesterfield |
| Point of interconnection | — |
| Requested (queue) date | 2018-12-20 |
| Proposed in-service date | 2027-10-29 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Dominion |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata