Hatfield 500kV (AA1-070)

Hatfield 500kV is a 1,710.0 MW other interconnection project in Greene, Pennsylvania with a current status of withdrawn.

1,710.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameHatfield 500kV
Queue IDAA1-070
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity1,710.0 MW
StatePennsylvania
CountyGreene
Point of interconnection
Requested (queue) date2014-10-06
Proposed in-service date2019-06-01
Operational date
Withdrawn date2016-11-23
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata