Hatfield 500kV (AC1-097)

Hatfield 500kV is a 1,140.0 MW gas interconnection project in Greene, Pennsylvania with a current status of withdrawn.

1,140.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameHatfield 500kV
Queue IDAC1-097
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity1,140.0 MW
StatePennsylvania
CountyGreene
Point of interconnection
Requested (queue) date2016-10-21
Proposed in-service date2021-06-01
Operational date
Withdrawn date2019-11-11
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.