Havana Wind (20INR0071)

Havana Wind is a 129.2 MW wind interconnection project in Hidalgo, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 8355 Goodwin - 8798 La Grulla.

129.2 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameHavana Wind
Queue ID20INR0071
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity129.2 MW
StateTexas
CountyHidalgo
Point of interconnectiontap 138kV 8355 Goodwin - 8798 La Grulla
Requested (queue) date2018-04-11
Proposed in-service date2022-12-31
Operational date
Withdrawn date2020-06-01
DeveloperTerra-Gen Development Company, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata