Headcamp BESS (68580_MHB)

Headcamp BESS is a 150.0 MW battery interconnection project in Pecos, Texas with a current status of operational.

150.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameHeadcamp BESS
Queue ID68580_MHB
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity150.0 MW
StateTexas
CountyPecos
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-06-01
Withdrawn date—
Developer—
Utility / transmission ownerLydian Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02operational_date—2026-06-01medium
2026-09-02proposed_online_date2026-06-01—medium
2026-09-02statusactiveoperationalhigh
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata