Heartsease-Mayo Dunbar DP (AF1-082)

Heartsease-Mayo Dunbar DP is a 18.0 MW battery interconnection project in Edgecombe, North Carolina with a current status of withdrawn.

18.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHeartsease-Mayo Dunbar DP
Queue IDAF1-082
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity18.0 MW
StateNorth Carolina
CountyEdgecombe
Point of interconnection
Requested (queue) date2019-08-29
Proposed in-service date2020-12-31
Operational date
Withdrawn date2024-04-08
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata