Hickerson Solar (21INR0359)
Hickerson Solar is a 311.1 MW solar+battery interconnection project in Bosque, Texas with a current status of active. It is proposed to connect at tap 345kV 68091 Navarro - 68040 Kopperl.
311.1 MWCapacity
ActiveStatus
ERCOTMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Hickerson Solar |
|---|---|
| Queue ID | 21INR0359 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Solar+Battery |
| Capacity | 311.1 MW |
| State | Texas |
| County | Bosque |
| Point of interconnection | tap 345kV 68091 Navarro - 68040 Kopperl |
| Requested (queue) date | 2019-05-29 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hickerson Solar |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata