Hidden Canyon (L0589)

Hidden Canyon is a 23.0 MW other interconnection project in Crook, Oregon with a current status of withdrawn. It is proposed to connect at BPA's Bonanza Substation (planned).

23.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameHidden Canyon
Queue IDL0589
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity23.0 MW
StateOregon
CountyCrook
Point of interconnectionBPA's Bonanza Substation (planned)
Requested (queue) date2023-12-14
Proposed in-service date2026-12-20
Operational date
Withdrawn date
DeveloperCentral Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata