Hidden Valley BESS (24INR0594)
Hidden Valley BESS is a 9.9 MW battery interconnection project in Harris, Texas with a current status of active. It is proposed to connect at Station Name (TSP Station Code): Hidden Valley (HV) Load/Load Transformer Name: TR4 PTI Bus Number: 45862 Voltage in kV (Transmission Level): 138 kV.
Project facts
| Canonical name | Hidden Valley BESS |
|---|---|
| Queue ID | 24INR0594 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Harris |
| Point of interconnection | Station Name (TSP Station Code): Hidden Valley (HV) Load/Load Transformer Name: TR4 PTI Bus Number: 45862 Voltage in kV (Transmission Level): 138 kV |
| Requested (queue) date | — |
| Proposed in-service date | 2026-03-27 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Regis Hidden Valley LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata