High Chap Solar is a 152.2 MW solar interconnection project in Brazoria, Texas with a current status of withdrawn. It is proposed to connect at 43035 Oasis 345kV - 42500 Dow Chemical 345 kV Ckt 18.
152.2 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | High Chap Solar |
|---|---|
| Queue ID | 25INR0068 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 152.2 MW |
| State | Texas |
| County | Brazoria |
| Point of interconnection | 43035 Oasis 345kV - 42500 Dow Chemical 345 kV Ckt 18 |
| Requested (queue) date | 2022-07-04 |
| Proposed in-service date | 2028-06-26 |
| Operational date | — |
| Withdrawn date | 2025-12-05 |
| Developer | High Chaparral Solar Project, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata