High Chap Solar (25INR0068)

High Chap Solar is a 152.2 MW solar interconnection project in Brazoria, Texas with a current status of withdrawn. It is proposed to connect at 43035 Oasis 345kV - 42500 Dow Chemical 345 kV Ckt 18.

152.2 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameHigh Chap Solar
Queue ID25INR0068
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity152.2 MW
StateTexas
CountyBrazoria
Point of interconnection43035 Oasis 345kV - 42500 Dow Chemical 345 kV Ckt 18
Requested (queue) date2022-07-04
Proposed in-service date2028-06-26
Operational date
Withdrawn date2025-12-05
DeveloperHigh Chaparral Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata