High Chaparral BESS 138kV (23INR0158)
High Chaparral BESS 138kV is a 51.7 MW battery interconnection project in Brazoria, Texas with a current status of suspended. It is proposed to connect at tap 138kV 42110 Angleton - 42875 Danbury c04.
51.7 MWCapacity
SuspendedStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | High Chaparral BESS 138kV |
|---|---|
| Queue ID | 23INR0158 |
| Status | suspended |
| Source status | suspended |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 51.7 MW |
| State | Texas |
| County | Brazoria |
| Point of interconnection | tap 138kV 42110 Angleton - 42875 Danbury c04 |
| Requested (queue) date | 2021-01-25 |
| Proposed in-service date | 2023-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | High Chaparral Solar Project, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata