Highpeak Solar 1 (66572_HPKS1)
Highpeak Solar 1 is a 10.0 MW solar interconnection project in Howard, Texas with a current status of operational.
10.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology
Project facts
| Canonical name | Highpeak Solar 1 |
|---|---|
| Queue ID | 66572_HPKS1 |
| Status | operational |
| Source status | (OP) Operating |
| Market | ERCO |
| Technology | Solar |
| Capacity | 10.0 MW |
| State | Texas |
| County | Howard |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2024-05-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PPM Solar LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata