HiTest 2-Furnace Plant (L0429)

HiTest 2-Furnace Plant is a 210.0 MW other interconnection project in Pend Oreille, Washington with a current status of withdrawn. It is proposed to connect at Pine Street Substation.

210.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameHiTest 2-Furnace Plant
Queue IDL0429
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity210.0 MW
StateWashington
CountyPend Oreille
Point of interconnectionPine Street Substation
Requested (queue) date2017-12-20
Proposed in-service date2021-01-04
Operational date—
Withdrawn date—
DeveloperPend Oreille County PUD No. 1
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.