Holstein 2 Solar (19INR0026)

Holstein 2 Solar is a 100.7 MW solar+battery interconnection project in Nolan, Texas with a current status of active. It is proposed to connect at 11406 Central Bluff 345kV.

100.7 MWCapacity
ActiveStatus
ERCOTMarket
Solar+BatteryTechnology

Project facts

Canonical nameHolstein 2 Solar
Queue ID19INR0026
Statusactive
Source statusactive
MarketERCOT
TechnologySolar+Battery
Capacity100.7 MW
StateTexas
CountyNolan
Point of interconnection11406 Central Bluff 345kV
Requested (queue) date2016-12-21
Proposed in-service date2028-04-03
Operational date
Withdrawn date
Developer229HD 8me LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.