Hood River Loads (L0402)

Hood River Loads is a 5.0 MW other interconnection project in Hood River, Oregon with a current status of operational. It is proposed to connect at BPA Hood River Substation.

5.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameHood River Loads
Queue IDL0402
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyOther
Capacity5.0 MW
StateOregon
CountyHood River
Point of interconnectionBPA Hood River Substation
Requested (queue) date2016-09-14
Proposed in-service date
Operational date2019-10-01
Withdrawn date
DeveloperHood River Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata