Hood River County, Oregon — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Hood River, Oregon, representing 508 MW of requested capacity.
15Total projects
1Active
7Operational
7Withdrawn
508 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 4 | 472 MW |
| Other | 9 | 31 MW |
| Hydro | 2 | 5 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| OR Queue Project G1036 — Wind in Hood River, Oregon | G1036 | Wind | 234.0 MW | active | Hood River, Oregon |
| OR Queue Project G0554 — Wind in Hood River, Oregon | G0554 | Wind | 148.0 MW | withdrawn | Hood River, Oregon |
| OR Queue Project G0553 — Wind in Hood River, Oregon | G0553 | Wind | 70.0 MW | withdrawn | Hood River, Oregon |
| West Queue Project 309 — Wind in Hood River, Oregon | 309 | Wind | 20.0 MW | withdrawn | Hood River, Oregon |
| Pyramid Substation | L0382 | Other | 14.0 MW | withdrawn | Hood River, Oregon |
| Hood River Loads | L0402 | Other | 5.0 MW | operational | Hood River, Oregon |
| West Queue Project 279 — Hydro in Hood River, Oregon | 279 | Hydro | 4.8 MW | withdrawn | Hood River, Oregon |
| Oregon Mines | L0447 | Other | 4.0 MW | withdrawn | Hood River, Oregon |
| Copper Dam Plant | 10323_TURGO | Other | 2.6 MW | operational | Hood River, Oregon |
| Middle Fork Irrigation District | 50917_GEN1 | Other | 2.0 MW | operational | Hood River, Oregon |
| Peters Drive Plant | 10324_GEN3 | Other | 1.8 MW | operational | Hood River, Oregon |
| Middle Fork Irrigation District | 50917_GEN3 | Other | 0.8 MW | operational | Hood River, Oregon |
| Middle Fork Irrigation District | 50917_GEN2 | Other | 0.5 MW | operational | Hood River, Oregon |
| West Queue Project 358 — Hydro in Hood River, Oregon | 358 | Hydro | 0.2 MW | withdrawn | Hood River, Oregon |
| PACW Queue Project FT003 — Other in Hood River, Oregon | FT003 | Other | 0.1 MW | operational | Hood River, Oregon |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| City of Cascade Locks | 2 | 18 MW |
| Three Canes Solar LLC | 1 | 20 MW |
| Farmers Irrigation District | 1 | 5 MW |
| Hood River Electric Cooperative | 1 | 5 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.