Hopewell-Surry 230 kV (AD2-008)

Hopewell-Surry 230 kV is a 52.1 MW solar interconnection project in Surry, Virginia with a current status of withdrawn.

52.1 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHopewell-Surry 230 kV
Queue IDAD2-008
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity52.1 MW
StateVirginia
CountySurry
Point of interconnection
Requested (queue) date2017-11-04
Proposed in-service date2019-09-30
Operational date
Withdrawn date2023-04-26
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.